Bitumen Drum Decander Or Asphalt Drum Decander
Bitumen in steel drums heated / melted by hot thermic oil in a closed well insulted chamber
• Loading of Bitumen Drums by hydraulically operated lifters
•Green technology without pollution
•Continuous loading and melting of drummed Bitumen & empty clean drum ejexts out from rear end of decanter Chamber gates remains closed by springs
• Float type level gauge in Bottom reservoir
•Heating chamber temperature & Bitumen reservoir temperature measured by PTR sensors and digitally displayed on it’s control panel
Heading
Sub Heading
Heading
Sub Heading
| CAPACITY | 2 TO 3 TONS/HOUR | 4 TO 5 TONS/HOUR | 4 TO 5 TONS/HOUR | 5 TO 6 TONS/HOUR | 6 TO 7 TONS/HOUR |
|---|---|---|---|---|---|
| MODEL | 2R X 10D | 3R X 9D | 3R X 12D | 3R X 12D | 4R X 10D |
| PRODUCTION CAPACITY | 3 TPH | 3.5 TPH | 4 TPH | 5 TPH | 5.5 TPH | 6 TPH | 6.5 TPH | 7 TPH | 8 TPH |
|---|---|---|---|---|---|---|---|---|---|
| RESERVOIR CAPACITY | 7.8M3 | 8.4M3 | 9M3 | 10.5M3 | 11.7M3 | 12.9M3 | 13.8M3 | 15.4M3 | 17M3 |
| CAPACITY | 2 TO 3 TONS/HOUR | 4 TO 5 TONS/HOUR | 5 TO 6 TONS/HOUR | 6 TO 7 TONS/HOUR |
|---|---|---|---|---|
| MODEL | 2R X 10D | 3R X 9D | 3R X 12D | 4R X 10D |
- Bitumen in steel drums heated / melted by hot thermic oil in a closed well insulted chamber
- Loading of Bitumen Drums by hydraulically operated lifters
- Green technology without pollution
- Continuous loading and melting of drummed Bitumen & empty clean drum ejexts out from rear end of decanter
- Chamber gates remains closed by springs
- Float type level gauge in Bottom reservoir
- Heating chamber temperature & Bitumen reservoir temperature measured by PTR sensors and digitally displayed on it’s control panel
- Most economical way Melting Bitumen in Drums means minimum
- fuel cost & labour cost per ton of melt Bitumen
- Pollution free technology
- User Friendly equipment – no skilled operator required





